1986 GE-McGraw-Towerpak-Belco 18MW Biomass Steam Turbine Generator
GE-McGraw-Towerpak-BelcoModel:18MW Bio Mass
Longmont, Colorado
Power Generation
Qty:1
Condition: New
At a glance
- Product
- 1986 GE-McGraw-Towerpak-Belco 18MW Biomass Steam Turbine Generator
- Manufacturer
- GE-McGraw-Towerpak-Belco
- Model
- 18MW Bio Mass
- Category
- Power Generation
- Condition
- NEW
- Availability
- In stock
- Price or process
- Request price
- Quantity
- 1
- Lead time
- Not provided
- Location
- Longmont, Colorado
- Fulfillment
- Pickup and shipping available
- Seller
- E&M Equipment
- Listed on
Key specifications
- Electrical Service Frequency
- 60Hz
- Fuel Type
- Biomass
- Number of Phases
- 3
- Power Factor
- 0.8%
- Power Rating
- 18000W
- Refurbishment Date
- 2002
- Turbine Type
- Condensing 15-stage
- Voltage Output Max
- 13800V
Supporting evidence
- Document: 1986 GE-McGraw-Towerpak-Belco 18MW Biomass Steam Turbine Generator document 2159e917-8a28-4322-86d4-22e880ab79cb
Document for 1986 GE-McGraw-Towerpak-Belco 18MW Biomass Steam Turbine Generator
Description
The 1986 GE-McGraw-Towerpak-Belco 18MW Biomass Steam Turbine Generator is a complete packaged power plant system designed for renewable energy production. It features a GE condensing 15-stage steam turbine driving a generator, fueled by biomass such as wood chips or agricultural waste, with an integrated boiler system. Rated at 18,000 kW (18 MW) output at 13,800 V, 3-phase, 60 Hz, and 0.8 power factor, it was originally built in 1986 and rebuilt in 2002 for extended service life. Ideal for industrial cogeneration, remote power supply, or green energy projects, it offers advantages over fossil fuel plants including lower operating costs from waste fuels, reduced carbon emissions, and high reliability. Drawbacks include site-specific biomass logistics and periodic maintenance for biomass handling. The system excels in efficiency for mid-sized renewable applications compared to smaller microturbines or larger coal plants.
Policies
Shipping Information
Estimated Delivery Time
Varies by seller location and shipping method; shipping quote available at checkout
Shipping Options
Resin8 facilitated freight, buyer-arranged freight and local pickup available
Shipping Fees
Buyer responsible for all shipping and logistics costs
Shipping Process
Equipment sold through Resin8 is shipped directly from the seller's location to the buyer. Resin8 does not take title or possession of equipment. Resin8 may collaborate with third party shipping services. Buyers may arrange freight carriers of their choice or coordinate pickup with the seller. Shipping timelines depend on seller readiness, equipment size, and carrier availability. All transportation, handling, insurance, export, and import requirements are the buyer's responsibility.
Return Policy
Return Window
No returns accepted
Return Conditions
This equipment is sold as-is, where-is
Refund Policy
All purchases on Resin8 are final. Equipment is sold in its existing condition and location with all faults and defects. Buyers are responsible for conducting due diligence, inspections, and verification before purchase. Refunds or cancellations are only possible in cases of confirmed seller breach or mutual written agreement between buyer and seller. Resin8 does not provide refunds or accept returns.
Terms and Conditions
Acceptance of Terms
By using the Resin8 marketplace or completing a transaction, you agree to Resin8's User, Buyer, and Seller Agreements.
Disclaimer
Resin8 operates solely as a marketplace facilitator connecting independent buyers and sellers of industrial equipment. Resin8 is not a seller, shipper, inspector, or warranty provider. Equipment listings, specifications, and AI-generated information may contain inaccuracies. Buyers and sellers are responsible for verifying all information and conducting appropriate due diligence. All transactions occur directly between users. Users must provide accurate information, comply with applicable laws, including export and sanctions regulations, and complete all committed transactions. Circumventing the platform after initial contact through Resin8 is prohibited.